IBR Compliance Note
For an applicable IBR supply, match the certificate to the component and the approved documentation schedule. Form III-B covers manufacture and test of tubes. Form III-A covers pipes / steam piping. Form III-C covers only boiler mountings and fittings. The table is indicative. Confirm the offered heat's IBR status and documents in the quotation.
The bands below are indicative boiler-quality seamless tube prices for orders placed in May 2026, per ASME SA192/SA210/SA213, covering ASME SA192, SA210 Grade A1 and SA210 Grade C. Pick the grade from the engineering drawing, design calculation and ITP. A generic plant or mill-duty label is not enough.
All our prices are per kilogram (₹/kg), ex-warehouse Kanpur, exclusive of the legally applicable tax stated on the current quotation. IBR-related cost varies with grade, dimensions, heat availability, inspection scope, testing and the applicable certificate. There is no universal percentage uplift. For an offer tied to your drawing and ITP, submit your RFQ.
Boiler Tube Price Table: SA192, SA210 A1 and SA210 C
| OD (mm) | Wall Thickness (mm) | SA192 (₹/kg) | SA210 A1 (₹/kg) | SA210 C (₹/kg) |
|---|---|---|---|---|
| 31.8 | 3.2 | ₹110-135 | ₹125-150 | ₹140-170 |
| 38.1 | 3.2 | ₹108-132 | ₹122-148 | ₹138-168 |
| 44.5 | 3.6 | ₹106-130 | ₹120-145 | ₹135-165 |
| 50.8 | 3.6 | ₹105-128 | ₹118-142 | ₹133-162 |
| 57.0 | 4.0 | ₹103-126 | ₹116-140 | ₹130-160 |
| 63.5 | 4.0 | ₹102-125 | ₹115-138 | ₹128-158 |
| 76.2 | 4.5 | ₹100-122 | ₹112-135 | ₹125-155 |
All prices shown are indicative price bands based on recent market conditions and are subject to change without notice. Actual quotation depends on quantity, grade, mill source, delivery location, and prevailing market rates. Contact us for a firm quote.
Understanding the IBR Premium
What Drives the Premium?
The cost of an applicable IBR supply depends on the approved mill route, inspection and test plan, tests, traceability, documentation and heat availability. For tubes, identify Form III-B where required. Form III-A belongs to pipes / steam piping. Form III-C belongs only to boiler mountings and fittings. Compare quotations only after their inclusions match.
Grade Comparison: SA192 vs SA210
SA192 and SA210 cover different carbon-steel boiler-tube product classes. You select Grade A1 or Grade C under SA210 from the engineering drawing, the current specification edition and the code calculation. Do not use a generic temperature or pressure shortcut.
Need SA213 T11/T22 Alloy Tubes?
For SA213 T11 or T22, send us the exact OD, wall, quantity, heat-treatment condition, testing and documentation schedule. Mill source, availability, dispatch estimate and price are confirmed for the offered heat in the quotation. Request alloy pricing →
The Right Buyers for Boiler Tubes in Kanpur
You should write the RFQ from the drawing, not from a district label. If you are buying water-wall or economiser sizes in Panki, you should name SA210 Gr A1 or Gr C, or SA213 T11 or T22 for superheater bundles, only when those grades appear on the approved drawing and ITP, and list the required stage-wise checks. A Dada Nagar process-heater or waste-heat-recovery enquiry should copy the specified SA192 (or other grade), OD and wall. A Jajmau process-steam replacement enquiry should send the drawing-specified tube, quantity and shutdown need-by date. One shutdown RFQ does not open a standing account.
If you send a shutdown RFQ from Lalitpur, Mahoba, Bijnor, Maharajganj, or another Bundelkhand or central-UP mill site, you should work backwards from the need-by date. Name the drawing-specified tube, quantity and inspection plan. You should not substitute ordinary water or structural pipe for a drawing-specified boiler tube. An applicable pressure-part repair needs the component, grade, IBR status, inspection plan and documentation approved before purchase. See local supply at seamless boiler tubes in Kanpur and grade detail at SA192 vs SA210.
Boiler Tube RFQ Checklist: What Your PO Must State
A boiler-tube PO is a legal document for the boiler file. Missing lines stall the inspector visit, not just the dispatch.
- OD with wall thickness: outside diameter and exact wall in mm, since boiler tubes are ordered by OD, not NB.
- Grade: SA192, SA210 Gr A1, SA210 Gr C, or the SA213 alloy grade from the engineering drawing.
- IBR requirement: whether the offered tube heat needs applicable IBR status, Form III-B and the project's document schedule.
- Condition: as-drawn, normalised, or tempered, and the heat-treatment certificate where the drawing calls for it.
- Test papers: MTC with chemistry and mechanicals, dimensional report, and heat-number traceability.
- Inspection: the ITP stages a named TPI agency will witness, from mill run through loading at the point stated in the quotation.
- Delivery basis: ex-warehouse Kanpur, tax as stated on the current quotation, shutdown-calendar delivery date, freight to the named site if quoted.
Worked Example: Budgeting an Economiser Bundle in SA210 A1
Take the common economiser size of 50.8 mm OD with a 3.6 mm wall. The site weight formula, (OD minus wall) times wall times 0.02466, gives (50.8 minus 3.6) times 3.6 times 0.02466, which is 4.19 kg per metre. The SA210 A1 band for this size is Rs 118 to Rs 142 per kg, so each metre costs about Rs 494 to Rs 595 ex-warehouse Kanpur before the legally applicable tax. A 6 m tube therefore lands at about Rs 2,967 to Rs 3,570.
Scale to a small bundle of 50 tubes at 6 m: 300 m of tube weighs 1,257 kg, or about 1.26 MT. The bundle budget becomes about Rs 1.48 lakh to Rs 1.78 lakh before the legally applicable tax and freight stated on the current quotation. Do not assume the table includes an IBR or inspection uplift. The formal quotation must identify the offered heat, applicable certificate, tests, TPI scope, freight and exclusions. Confirm tonnage on the pipe weight calculator and walk through the papers on our MTC sample page.
Treat that result as a budgeting comparison, not a grade-selection shortcut. Normalise both offers to the same OD, wall, material grade, heat-treatment condition, IBR stamping, tube length, inspection hold points and delivery basis before you compare per-kilogram rates. Ask each supplier to mark line-by-line exceptions against the drawing and ITP. An offer that excludes an inspection stage, a test document or a freight item is not like-for-like with one that includes it.
Common Procurement Mistakes on Boiler Tube Orders
- Ordering by NB instead of OD. Boiler tubes trade on OD with wall thickness. An NB callout invites the wrong tube to site.
- Assuming an A106 offer carries the boiler dossier. Before you order, match the drawing-specified grade, applicable IBR status, tests and the tube Form III-B requirement.
- Mixing grades in one bundle. SA192 and SA210 look identical on the rack. Segregate heats and mark bundles before dispatch.
- Leaving alloy supply condition open. State the SA213 grade, heat-treatment condition, tests and ITP. Ask the mill offer to confirm its actual dispatch estimate.
- Ignoring the shutdown need-by date. Separate available heats from mill-procurement lines. Add inspection, document review, transport and site receiving to the schedule.
Standards and Compliance: SA192, SA210, SA213 and IBR Forms
ASME SA192 and SA210 cover seamless carbon-steel boiler and superheater tubes within the scopes printed in their current editions. Grade A1 and Grade C under SA210 differ in the carbon and tensile limits of that edition. SA213 covers chrome-moly alloy grades such as T11 and T22 when the drawing names them. Read those limits from the governing edition and the approved inspection plan. The drawing and code calculation select the grade. This page does not assign a generic service-temperature or pressure limit.
For an applicable IBR supply, use the certificate for the supplied component. Form III-B is the manufacture-and-test certificate for tubes. Form III-A covers pipes / steam piping. Form III-C applies only to boiler mountings and fittings. Confirm the required stamping, inspector involvement, heat cross-reference and dossier against the current project ITP. Do not apply one form to every line. Read the clause detail on our SA192 reference, SA210 reference and IBR regulations guide, or compare alloys at SA210 vs SA213.
Dispatch From Kanpur on Shutdown Calendars
If you are writing an RFQ from Panki, Dada Nagar, Jajmau or the Bartan Bazar market area, you should send us the approved drawing and ITP. List the OD, wall, grade, quantity, need-by date and delivery PIN. Ask the offer to identify the offered heat, applicable Form III-B status, inspection steps, dispatch estimate and commercial terms for that request.
For a shutdown order, work backwards from the site need-by date through document approval, inspection hold points, release, loading, transit and receiving. Name the destination PIN on the RFQ. The formal quotation should then state whether that lane is offered, with freight, dispatch estimate, transit basis, unloading responsibility, payment terms and validity for that request. Follow sourcing context on the Kanpur steel market page.
Key Points
- Boiler bands run Rs 100 to Rs 170 per kg ex-Kanpur across SA192, SA210 A1 and SA210 C.
- For applicable tube supply, confirm IBR Form III-B, tests, traceability and inspection scope for the offered heat.
- A 50.8 by 3.6 mm SA210 A1 tube weighs 4.19 kg per m; a 50-tube bundle budgets near Rs 1.48 to 1.78 lakh.
- Order boiler tubes by OD with wall, grade, IBR line, and heat-treatment condition.
- Ask the mill offer to separate available and indent lines and state the actual inspection and delivery schedule.
Other Current Price Lists (May 2026)
IS 1239, IS 3589
GI Pipe PricesIS 1239 galvanized
Seamless Pipe PricesA106 Gr.B, A53
Precision Tube PricesDIN 2391, IS 4923
Pricing Freshness (May 2026)
Prices on this page are indicative bands tracked against boiler-tube input and mill pricing. The bands shown reflect May 2026 trading. For an exact quote on your OD, wall, grade, documents and delivery location, request a firm quote. Rely on the price, freight, dispatch estimate and validity period stated there.
Frequently Asked Questions
What does IBR-certified mean for boiler tubes?
What is the price premium for IBR-stamped tubes?
What is the difference between SA210 Grade A1 and Grade C?
How are SA213 T11 or T22 alloy tubes quoted?
What documentation comes with boiler tubes?
Which grade suits economiser, water-wall, and superheater duty?
Sources and References
- ASME SA192, Specification for seamless carbon steel boiler tubes for high-pressure service (ASME). Read the grade scope from the current edition and the project drawing.
- ASME SA210, Specification for seamless medium-carbon steel boiler and superheater tubes (ASME). Defines Grade A1 and Grade C chemistry and tensile levels.
- Applicable Indian Boiler Regulations and Forms III-A, III-B, and III-C (Central Boilers Board). Match the form to pipes / steam piping, tubes, or mountings and fittings as the approved documentation schedule requires.
- SA192 reference, SA210 reference, and IBR guide on this site for clause detail.