
Thermal Power Plants
High-pressure boiler tubes and steam distribution lines.
Wholesale distributor of steel pipes & tubes, serving industrial buyers across Northern India.
Our Story
Established in 1994, RP Sales began by supplying Kanpur's growing industrial sector with steel pipe. Today, the business handles wholesale enquiries for MS ERW pipes, seamless boiler tubes, precision hydraulic tubes, and related product families from its Kanpur base.
Founded in Kanpur by the Jain family to supply the local engineering sector.
Expanded product portfolio to include seamless boiler tubes and heavy-duty borewell pipes.
Expanded the supplier network used to quote Indian mill material for industrial enquiries.
Modernized warehouse and material-handling infrastructure in Kanpur.
Handles wholesale enquiries for industrial projects in Uttar Pradesh and neighbouring states.

Verified Identifiers
GST Number
09AAPPJ2395A1ZN
UDYAM (MSME)
UDYAM-UP-43-0026558
Trade Licence: Kanpur Nagar Nigam
Kanpur base
RP Sales sells ex-warehouse Kanpur to buyers in Kanpur and the surrounding Uttar Pradesh and North India industrial belt. It serves Kanpur Dehat and Unnao plus the Kanpur industrial belt (Panki, Dada Nagar, Fazalganj, Jajmau, and Chakeri). Enquiries can name Lucknow, Agra, Prayagraj, Varanasi, Gorakhpur, Jhansi, Bareilly, Patna, or Delhi NCR as the destination. The written quotation should separate the material rate, applicable tax, freight basis, and the validity that applies to that offer.
The buyer mix shapes the enquiry list. PWD and JJM tender bidders may request IS 1239 GI and MS ERW pipe in Light, Medium, or Heavy class and should state any MTC or traceability clause from the tender. Sugar mills in the belt enquire for evaporator tubes, bagasse-boiler requirements, and heavy structural MS pipe. Hydraulic shops buy cold-drawn precision tubes, printing and packaging units buy seamless cylinder bases, borewell contractors buy drill and casing pipe, and fire-system installers buy threaded and grooved ERW lines. One RFQ can combine several pipe families so feasibility, packing, vehicle selection, and commercial terms are reviewed against one bill of materials.
Local buyers can ask for an ex-works Kanpur collection basis; outstation buyers should provide the destination PIN code and receiving constraints. The current stock position, preparation work, loading queue, vehicle availability, and route conditions determine readiness and transit estimates. Buyers needing non-standard lengths should include the cutting schedule and tolerances in the RFQ. Start with the Kanpur pipe page, check the Kanpur steel market notes, or send the BOM to the RFQ desk.
Industries
Enquiries span India's industrial sectors, from thermal-power requirements that specify regulated boiler material to local construction requirements for scaffolding and structural pipe. Each request still needs its own technical and commercial review.

High-pressure boiler tubes and steam distribution lines.

Cold-drawn precision tubes for shock absorbers and cylinders.

Evaporator tubes, bagasse boilers, and heavy structural MS pipes.

Seamless cylinder bases for rotogravure and flexographic presses.

Scaffolding, water supply, and structural ERW pipes.
Leadership
RP Sales is run by people who know the Indian steel market inside out. We prioritize long-term relationships over short-term transactions.

Managing Director
Over 30 years of expertise in steel procurement, mill relations, and large-scale bulk supply logistics.
Call Ajay
Director of Sales & Operations
Leads technical sales, client relationships, and the review of purchase-order requirements.
Call Ayush
Infrastructure
Our central facility in Kanpur supports storage, order preparation, and loading of steel pipe and tube requirements. Current stock and dispatch readiness are confirmed against the requested grade, size, quantity, packing, and vehicle rather than promised from a general page.
Enquiries can specify Indian and international standards such as IS, ASTM, DIN, and EN. The quotation must confirm the offered standard, inspection plan, marking, and certificate availability; those requirements vary by product and source.
Quality practice
Traceability starts with the purchase specification, not a universal warehouse promise. If the job requires heat or batch traceability, the RFQ should name the identifier, marking, MTC fields, and document format that must follow the material. Where a BIS licence or ISI marking is required, the buyer should identify the applicable product standard and verify the offered manufacturer's marking scope. Under the current IBR forms index, Form III-A covers steam pipes, Form III-B covers tubes, and Form III-C covers boiler mountings and fittings. The ordered product, current regulation, and inspecting authority determine which form belongs in the PO.
Handling and inspection also depend on the material. Precision surfaces may need separation and protective packing; long lengths may change the vehicle; a tender may require a named third-party inspector or witness point. Ask the quotation to state the packing, loading, inspection, charge allocation, acceptance criteria, and claim procedure. At receipt, preserve photographs, markings, and documents for any reported mismatch. The quality and inspection page and the MTC review guide explain the checks without promising that one document package applies to every product.
Project supply
Quantity references answer separate questions. A 1 MT enquiry floor applies only to selected stocked standard price-list sizes, while standard ERW orders generally use a 3 to 5 MT minimum. The 5 MT figure on the price pages marks a volume-pricing reference, not a universal acceptance threshold. The 9 MT to 30 MT range is a vehicle-planning reference, not another minimum or a guaranteed discount. The quotation should state which minimum, price tier, and vehicle plan apply to the actual product mix.
A useful project schedule separates material approval, source readiness, inspection, cutting or preparation, loading, transit, and site receipt. Ask for each milestone on the current offer and identify any approval hold point. Mixed-family loads require a compatibility and packing review; they should not be assumed feasible merely because their combined weight fits a vehicle. The document schedule should likewise list the invoice, e-way bill, packing list, MTC, IBR form, or inspection release only where it applies to that order.
For Lucknow, Agra, Prayagraj, Varanasi, Gorakhpur, Jhansi, Bareilly, Patna, or Delhi NCR, state the PIN code, gate hours, road and vehicle limits, unloading equipment, and contact person. The carrier and seller can then confirm a workable estimate for that movement. The buying guide and how pricing works help buyers compare offers before the PO goes out.
Sourcing
A manufacturer name alone does not prove that the offered item meets a project clause. Ask the quotation to identify the proposed manufacturer, manufacturing route, standard, grade, dimensions, origin, marking, and certificate scope. Examples named elsewhere on the site include APL Apollo, Tata Structura, Jindal (India), JSW Steel, Surya Roshni, and Hi-Tech Pipes as alternative manufacturers, not paired or joint sources. Their current availability, commercial relationship, licence scope, and suitability for a particular RFQ must be confirmed rather than inferred from this list.
Source review affects price, lead time, and documents. A source with the requested certification may differ from one offering only a commercial test report; an odd size may require a production lot rather than warehouse stock; a tender may restrict an approved-make list. Record those requirements before seeking prices. The weight and class charts provide dimensional references, while the RFQ establishes whether a source can offer that combination under the required commercial and quality terms.
Before placing the PO, compare the quotation with the tender or drawing line by line. If heat traceability is required, define how the material marking, packing list, and certificate must correspond. If third-party inspection is required, define the agency, notice period, witness stage, acceptance criteria, and who pays. These controls make the requested chain auditable without asserting that every load already carries the same marks or records.
For a new source, buyers can request a specimen certificate or licence reference before commercial approval and compare its manufacturer name, standard, grade, heat or batch field, test values, and authorization with the tender. That document review is separate from current stock confirmation: a technically acceptable source may not have the required size or quantity available for the requested date.
Working with us
The path has five stages. The buyer sends an RFQ with product type, OD or NB, wall thickness or schedule, grade, length, quantity, delivery PIN code, and the documents the site needs. RP Sales returns a written quotation with the proposed mill, the certificate scope, freight and tax lines, and the validity window. The buyer reviews those terms and issues a PO. The proforma invoice should then record the applicable payment basis, any advance or approved credit, cancellation terms, and delivery basis. Read these from the current documents rather than assuming a standing seller policy.
The pre-dispatch check should compare the material, packing, marks, quantities, and document schedule with the PO. The GST invoice and e-way bill apply as required by the transaction; a packing list, MTC, IBR form, inspection release, or special protection belongs in the packet only when ordered and confirmed. Loading method, packing materials, inspection access, and charges must be stated in the commercial terms rather than treated as universally included.
| Topic | Question for the quotation | Evidence to retain |
|---|---|---|
| Material | Which manufacturer, grade, size, quantity, and heat or batch are offered? | Quotation and approved technical schedule |
| Quantity | Which order minimum and price tier apply to this material mix? | Quoted quantity, unit, and rate basis |
| Documents | Which MTC fields, markings, IBR form, or inspection release are included? | Document schedule attached to the PO |
| Delivery | What readiness and transit estimates apply, and from which event? | Named destination, vehicle basis, and offer validity |
| Handling | What packing, loading, and unloading provisions are included? | Written scope and charge allocation |
| Inspection | Who inspects, at what stage, against which acceptance criteria? | Inspection plan and release record, if required |
| Tax and freight | Which product classification, GST line, and carrier basis apply? | Quotation, invoice, and carrier document |
The yard fits bulk and repeat buyers: contractors running water, drainage, fire, and structural lines; tender bidders who need MTC traceability in the bid file; process plants replacing boiler and heat-exchanger tubes; and OEM shops cutting hydraulic and printing cylinder stock to length. Buyers with smaller requirements should submit the exact size and quantity because acceptance and pricing depend on the available source, cutting scope, and order minimum. Anyone collecting from Kanpur should confirm readiness and loading arrangements before sending a vehicle.
Related pages: product catalogue, ERW supply in Kanpur, GI pipes in Kanpur, seamless pipes in Kanpur, quality and inspection.